Consider the three phase distribution system and the linear load as shown:
The linear load is operating at a Power Factor of 0.7 lagging. It is desired to bring the Power Factor of the system up to unity (i.e. 1.0). A capacitor bank has been sized and designed to provide the necessary KVAR.
Question #1:
Where would you place the Power Factor correction capacitor bank?
at;
Phone:
(804) 360-9288
FAX:
(804) 360-7824
E-Mail: info@LehmanEngineering.com
Address:
Lehman Engineering Company
P. O. Box 29160
Richmond, Virginia 23242
All Rights Reserved | Lehman Engineering Company | 804-360-9288 | PO BOX 29160 Richmond VA 23242 | Website by RCC